SawmillSmart optimizes production planning across a multi-week horizon — evaluating thousands of cutting combinations to maximize lumber yield, reduce log costs, and build plans your team can actually execute.
Built for real sawmill operations — from planning teams to production leadership.
Run production simulations across your full order book. SawmillSmart evaluates thousands of cutting combinations — ranking each by lumber recovery, log cost, and fulfillment match — so you make informed decisions before committing resources.
Each simulation run produces a ranked list of scenarios with full economic breakdown: m³ processed, recovery %, value per log, and total production cost. Compare runs side by side.

"The average mill leaves 2–4% yield on the table by planning shift-by-shift. At 120,000 m³/year with logs at €150/m³, that's €700,000–1,400,000 per year — every year."
At 50% yield, a mill producing 120,000 m³/year consumes ~240,000 m³ of logs — €36M in raw material. A 2–4% recovery improvement reduces that spend by €700K–1.4M annually, without capital investment.
SawmillSmart's rolling planner maintains a living, adaptive production plan across your next 4 weeks. As orders change, inventory shifts, or line conditions evolve — the plan updates. No more planning meetings that start from scratch every Monday.
The Operational Plan view shows real-time order fulfillment progress, frozen zone protection for committed shifts, and coverage percentage — so you always know where you stand against your order book.

Import your lumber orders, define cutting specifications down to species, moisture range, and volume. SawmillSmart tracks progress from planning confirmation through production completion — with full transparency at every stage.
Filter by status: Planned, Confirmed, In Production, Completed, On Hold. Bulk actions, rush flags, and hold markers keep your planning team aligned without back-and-forth.

For every cutting pattern in the simulation, SawmillSmart renders a precise cross-section visualization — showing board placement, wane allowance zones, and effective zone boundaries against the actual log diameter.
Yield percentage, board count, log volume, and the full cuts table are shown alongside the diagram. Your planners see the same picture the optimizer sees — no black box, no guesswork.

Not shift-by-shift.
Multi-week.
The planning horizon is the single biggest lever in optimization quality. Longer horizons mean more combinations, better tradeoffs, and decisions that look smart a week later — not just in the moment.
A production cycle that used to take hours of manual effort, now automated.
Import your sawing specifications and lumber orders. Define volume, species, moisture, and deadlines.
SawmillSmart evaluates thousands of cutting patterns and ranks scenarios by yield, cost, and fulfillment.
Review the optimal scenario and confirm it. The rolling planner updates automatically across your 4-week horizon.
The shift schedule is generated automatically. Your floor team works from a clear, executable plan — no guesswork.
"Before SawmillSmart, we planned by gut feeling and spreadsheets. Now I can see four weeks out, know exactly which orders are at risk, and run a new simulation in minutes if something changes on the line."
The complete guide to sawmill optimization in 2026. Six levers and five principles to recover margin — without CapEx.
Read article →Request a live demo — we'll walk through your order structure, show you a real simulation run, and answer every question your planning team has.
No credit card required for the demo. 3-day free trial available on all plans.